Some extra information. For some product we are now using manual reorder point.
Because this type of MRP does not use the information in SAP is does not calculate when we must place a new order in the future. This is not the prefered situation, therefor I want that SAP uses the reservations to calculate the stocklevel and the moment the order must be placed.
So if there is an option to use a (semi) fixed safety stock whereby the stocklevel is calculated based on reservations, I am more then interested
gr.
Stefan