Hi,
ECC 604
I have configured the 3rd party scenario for which PR is created automatically once the SO is saved. I have a requirement to create a new PR whenever the line item is added to the existing SO instead of adding a new line item to the existing PR.
To be clear ,
Step 1 : Create a SO for one line item and when i save the SO , PR is created automatically which is fine.
Step 2 : Then i go the change mode of the same SO and adding a new line item and when i save the SO , a new line item is added to the existing PR which is created from step 1.
Now my requirement is when i amend the SO with a new line item , a new PR has to be created instead of adding a new line item to the existing PR. Could anyone throw some light on 1) is it possible to set this up 2) if yes then how to do this setting.
Thanks in advance..